General engineering guidance only. Final equipment selection, safety controls and operating procedures must be approved for the actual project.
Process
Medium composition, contaminant type, solids loading, viscosity, operating schedule and the purpose of the filtration step.
Hydraulics
Normal and peak flow, inlet and outlet pressure, allowable differential pressure, temperature and available pump information.
Performance
Target retention, clarity, downstream protection, cake or discharge requirement, and acceptable product loss.
Equipment and site
Preferred mechanism, quantity, footprint, maintenance clearance, connections, utilities, hazardous area and installation environment.
Commercial and documentation
Project timing, delivery location, Incoterm, inspection points, certificates, drawing format and required quotation currency.
Turn the checklist into an equipment review
Send the information already available; JINLV can identify the remaining decision-critical inputs before a quotation is prepared.
Submit technical inquiryReturn to resources →