JINLV Equipment · Shanghai engineering
JINLV Filter Consumables ↗sylvia@shpjgl.comWhatsApp +86 189 1712 9443
Large JINLV candle filter vessels in workshop production
Industrial filtration equipment · Shanghai

Industrial Filtration Equipment.
Engineered in Shanghai.
Built for Your Process.

From standard filter housings to complete custom skids, JINLV configures vessels, piping, valves, instrumentation and controls around your medium, duty point and operating method.

ISO 9001:2015CE document with model annex8-hour inquiry responseCustom project engineering
01Equipment engineering, visibly connected to the JINLV brand.
Portfolio6current equipment families
Solutions9industry and operating-objective routes
Case evidence56drawing-backed custom case previews
Response8Hinquiry response commitment
Current equipment range

Six routes to the right filtration equipment.

Explore the current JINLV product framework and open a dedicated product page.

What we provide

More than a vessel: a workable filtration package.

The supply boundary can begin with one standard housing or extend to a custom skid. Every project is confirmed against the actual process and approved interfaces.

01

Filter equipment

Bag, cartridge, automatic, diatomite, plate and filter press equipment selected by filtration mechanism.

02

Integrated skids

Housing, pump, piping, valves and instruments arranged around the available footprint and operating sequence.

03

Controls & automation

Manual or automated cleaning logic with project-specific control and interlock requirements.

04

Engineering support

Selection review, drawing confirmation, remote installation guidance and optional on-site commissioning.

Qualification evidence

CE and ISO certificates—visible, readable and verifiable.

The homepage now shows the current certificate documents instead of relying on a text badge. Use the original document links to inspect the printed holder, certificate number, scope and validity.

Accuracy note: certificate holder names below are reproduced exactly as printed. CE applicability must be confirmed against the product and model annex for each quotation.
ISO 9001:2015 quality management system certificate
Quality management system

ISO 9001:2015

Holder
Shanghai Pujiang Jinlv Filtration Machinery Co., Ltd.
Number
12426Q00698R001
Scope
Sales of filtration equipment and consumables
Valid to
29 July 2029
Machinery Directive attestation of conformity for filtering equipment
Machinery directive document

CE · Filtering Equipment

Holder
Shanghai Pujiang Golden Filter Machinery Co., Ltd.
Number
M.2026.206.C143127
Report
CE-PJ26062304MD
Valid to
22 June 2031 · model scope per annex
Four-wheel mobile filter cart supplied for a custom project
Representative project photograph · final configuration is confirmed from project drawings and approved process inputs
Custom capability

When a catalogue model is not enough.

JINLV can configure vessels, skids, pump packages, piping, electrical options and controls around the site. The case library uses cropped, drawing-backed previews to demonstrate engineering routes without publishing complete customer production drawings.

56drawing-backed case previews
1unit minimum for equipment projects
3EXW · FOB · CIF
8Hinquiry response commitment
How we work

A clear path from process conditions to approved equipment.

Incomplete information is acceptable at first contact. We identify the missing inputs before confirming the mechanism, materials, interfaces and supply boundary.

01

Define the process

Medium, flow, pressure, temperature, solids, target accuracy and operating mode.

02

Select the route

Compare filtration mechanisms before choosing a catalogue family or custom configuration.

03

Confirm the design

Approve materials, dimensions, interfaces, controls, footprint and required documents.

04

Build and verify

Manufacture to the approved scope, inspect the equipment and prepare shipment evidence.

Talk to an engineer

Send the process conditions you already have.

A partial brief is acceptable. Sylvia will respond within 8 hours and identify the next information needed for a useful equipment recommendation.

Submit technical inquiry →
WAAsk Sylvia